A new GC or municipal contract
Prime contractors and public owners often ask for your written trenching program and competent person records.
Industries / Excavation, trenching & utility contractors
For excavation, trenching and underground utility crews
Cave-ins, utilities, water and bad air: Subpart P covers a lot of ground. Upload your excavation program and safety manual, and we check them point by point against the OSHA excavation rules, quoting your document wherever it addresses a rule.
When owners use it
Prime contractors and public owners often ask for your written trenching program and competent person records.
Make sure what your program says matches what you teach and what the standard requires.
A wall sloughs or a utility gets hit, and you want to know what your paperwork says and what's missing.
What we check
From the Construction Safety (OSHA 29 CFR 1926) rule pack. Each finding names the rule it's measured against and, where your document addresses it, quotes your words, checked word for word.
We check your written program, not your soil classification or protective system design. Tabulated data and engineered systems still need a competent person or a registered professional engineer.
Deep checks
A deep check reads all of your documents against one topic the way an inspector would go down a checklist, and marks each point met, partial or missing. Topics for this industry:
Deep checks come with the One-Time Report and the monthly plans.
What to upload
PDF, Word or plain text. Please don't upload personnel files, patient records or anything with Social Security numbers: the check only needs your policies and programs.
Compliance information and organizing tools, not legal advice. Have your safety or HR person confirm the findings that matter most.
Other industries